Monday 10 June 2013

90 miles apart

The T is parked up at my shop, so I get to do a bit at the weekends, last weekend I started to pull the steering apart and moved the firewall back 27" to make room for the second motor and a coupling.






Heading southeast to my day job, ive been working on the front engine, its cleaning up nicely, thanks to it being packed full of grease before it was put in storage.

with the motor and hogshead turned upside down I could mark the cut line for the rear of the sump. I will need to weld in a front face to the oil pan. The two motors will be braced together using two 8"x1/4" plates running either side of the two sumps.